Quantitative Metrics

Engineering effort quantification and performance analysis

Effort Summary

AreaApprox. Atomic Actions
Core Release 3.1 Enhancements25+
SLA & Tasking Corrections15
Notification System20+
Ordering Portal Hardening15
UI/UX Bug Fixes15
Access & Security10+
Data & Configuration Adjustments10+
Total110+

Engineering Effort by Area

Total: 110+ discrete engineering actions across 7 days

Resolution Performance

Issue Resolution Time (Hours)

Under 2h 2-3h 3-4h 4h+

Most issues were resolved within 1–3 hours of being reported. The longest-running issues (Order Notes Persistence and Manage Delays Logic) required deeper investigation into form state management and resubmission logic.

Activity Distribution

Daily Activity Volume

Peak activity occurred on Feb 7 (Day 4 of stabilisation), when Dashboard v2 403 errors, SLA persistence issues, document upload bugs, and ordering access problems all converged simultaneously.

Contributor Distribution

Contributor Activity Distribution

Methodology Note

The "110+ atomic actions" figure includes:

  • Code changes and commits
  • Configuration updates (server, database, application)
  • Deployments (preprod, production)
  • Investigation and reproduction steps
  • Validation and verification cycles
  • Cross-environment data synchronisation

Individual Slack messages were not counted as actions - only discrete engineering activities that changed system state or advanced issue resolution.