Release 3.1Metrics
Quantitative Metrics
Engineering effort quantification and performance analysis
Effort Summary
| Area | Approx. Atomic Actions |
|---|---|
| Core Release 3.1 Enhancements | 25+ |
| SLA & Tasking Corrections | 15 |
| Notification System | 20+ |
| Ordering Portal Hardening | 15 |
| UI/UX Bug Fixes | 15 |
| Access & Security | 10+ |
| Data & Configuration Adjustments | 10+ |
| Total | 110+ |
Engineering Effort by Area
Total: 110+ discrete engineering actions across 7 days
Resolution Performance
Issue Resolution Time (Hours)
Under 2h 2-3h 3-4h 4h+
Most issues were resolved within 1–3 hours of being reported. The longest-running issues (Order Notes Persistence and Manage Delays Logic) required deeper investigation into form state management and resubmission logic.
Activity Distribution
Daily Activity Volume
Peak activity occurred on Feb 7 (Day 4 of stabilisation), when Dashboard v2 403 errors, SLA persistence issues, document upload bugs, and ordering access problems all converged simultaneously.
Contributor Distribution
Contributor Activity Distribution
Methodology Note
The "110+ atomic actions" figure includes:
- Code changes and commits
- Configuration updates (server, database, application)
- Deployments (preprod, production)
- Investigation and reproduction steps
- Validation and verification cycles
- Cross-environment data synchronisation
Individual Slack messages were not counted as actions - only discrete engineering activities that changed system state or advanced issue resolution.